The outcome display that if the force stabilization time is two min, the coincidence diploma in the indoor and discipline drilling fluid lost control efficiency is the very best along with the analysis result of the drilling fluid lost control performance is “good.Exceeding fracture strain: Lousy estimation of formation strength and slim pore–